Contract 73354 REL 114: 2007-155-00 EXP DESIGN AND PLAN FOR STURGEON FACILITY
Project Number:
Title:
Develop a Master Plan for a Rearing Facility to Enhance Selected Populations of White Sturgeon in the Columbia River Basin
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Columbia Lower Middle 100.00%
Contract Number:
73354 REL 114
Contract Title:
2007-155-00 EXP DESIGN AND PLAN FOR STURGEON FACILITY
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Issued
Contract Description:
This coming contract year will see an number of major tasks completed, including the Water Plan, the engineering MOA, final infiltration gallery and well testing, and the engineering design.  These tasks and their associated milestones will set the stage for the initiation of the EC and final Master Plan edits in preparation for the completion of Step 2 of the 3 Step Process within the next couple of years.  
Account Type(s):
Expense
Contract Start Date:
09/01/2024
Contract End Date:
08/31/2025
Current Contract Value:
$138,890
Expenditures:
$30,125

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Contract Development and Direction 08/31/2025
Upload draft YNSH/Marion Drain Property Water Plan to CBfish C: 174. Development of Yakama Nation Sturgeon Hatchery water plan at the Marion Drain Property 08/31/2025
Meeting Notes Distributed D: 189. Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin 08/31/2025
EC Documents F: 165. STEP 2: Assist with NEPA process contracted by BPA 08/31/2025
Summary of final construction/access MOA, draft SOW for the design and engineering G: 122. Support the development/implementation of the YNSH design and engineering contract 08/31/2025

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sturgeon, White (A. transmontanus) - Lower Columbia River
  • 1 instance of WE 196 Council Step Process
  • 1 instance of WE 174 Produce Plan
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS
  • 1 instance of WE 196 Council Step Process
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Contract Development and Direction
C 174 Development of Yakama Nation Sturgeon Hatchery water plan at the Marion Drain Property 07/03/2024
D 189 Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin
E 196 STEP 2: Master Plan Step 2 Tasks
F 165 STEP 2: Assist with NEPA process contracted by BPA
G 122 Support the development/implementation of the YNSH design and engineering contract
H 132 Annual progress report not required